A durable tub-to-shower conversion is a coordinated waterproofing and finish project. Existing conditions determine how much work is required behind the visible surfaces.

Demolition reveals the real conditions

Once the existing tub and wall finishes are removed, the project team can verify framing, plumbing, subfloor condition, and any evidence of prior leakage. These conditions should be documented before rebuilding.

Waterproofing is the core system

The receptor, curb or curbless transition, wall waterproofing, niches, corners, and penetrations must work as one assembly. Tile is a finish surface, not the primary waterproof layer.

Coordinate fixtures and glass early

Valve locations, shower heads, handhelds, blocking, niches, benches, and glass attachment points should be planned before walls are closed.

Typical range

A tub-to-shower conversion may range from $15,000 to $30,000 depending on tile, glass, plumbing, layout, and hidden conditions. Final pricing is confirmed after an on-site assessment.

Plan the scope before the finish.

Every project is shaped by existing conditions, selections, access, and local requirements. Final pricing is confirmed after an on-site assessment.